Relays Activity (minutes)Updated a year ago
The relays activity shows the runtime per relay output, when in heat or cool mode and any schedule overrides initiated. This report is most helpful in determining how the HVAC system is operating overall. If excessive runtime is noticed, is it simply due to a constant demand for heat or cool or could it be the HVAC system is not operating efficiently? This helps make an informed decision if/when service may be needed.
Relay designation and description:
- G: (Fan).
- Y1: (Compressor Stage 1).
- Y2: (Compressor Stage 2).
- W1: (Heat Stage 1).
- W2: (Heat Stage 2).